Revenue Agenda
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
No Result
View All Result
Revenue Agenda
No Result
View All Result
Home Investing

Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics

admin by admin
June 2, 2025
in Investing
0
Ore Reserve Quadruples for Rhyolite Ridge Project; Reaffirms Robust Project Economics
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Ioneer Ltd (ASX: INR, Nasdaq: IONR) (Ioneer) is pleased to announce a 308% upgrade to the Ore Reserve estimate for its 100%-owned Rhyolite Ridge Lithium-Boron Project (‘Rhyolite Ridge’ or the ‘Project’) in Nevada, USA, alongside updated Project economics.

  • Rhyolite Ridge Ore Reserve more than quadrupled from 60 million tonnes in 2020 to 247 million tonnes, delivering a mine life of 95 years
  • Ore Reserve now contains a total of 1.92 Mt of lithium carbonate equivalent and 7.68 Mt of boric acid equivalent
  • Underpinning plans for a large, long-life, low-cost expandable operation, producing lithium carbonate, boric acid and then battery-grade lithium hydroxide
  • Stable co-product – boric acid accounts for an average 25% of annual revenue in the first 25 years; helping ensure positive EBITDA at low lithium prices and EBITDA margin of 65.7% based on average production over first 25 years
  • All-in sustaining cash cost of US$5,745 per metric tonne lithium carbonate equivalent places the Rhyolite Ridge Project in the bottom of the global lithium cost curve
  • Compelling Project economics with an after-tax NPV of US$1.367 billion, and an unlevered, after-tax internal rate of return (IRR) of 14.5%

The Ore Reserve has increased by 186.6 million tonnes (Mt) and approximately 48% of the Mineral Resource has been converted into Reserve, now estimated at:

  • 246.6 Mt at 1,464 ppm lithium and 5,444 ppm boron
  • Containing 1.92 Mt of Lithium Carbonate Equivalent (LCE) and 7.68 Mt of Boric Acid Equivalent (BAE)

“Today’s updated Reserve and Mine Plan reinforces the importance of Rhyolite Ridge’s remarkable mineralogy. Our Ore Reserve estimate of 247 Mt containing a total of 1.92 Mt LCE and 7.68 Mt BAE make it the largest lithium-boron Reserve in the world,” said Bernard Rowe, Managing Director, Ioneer. “It allows Ioneer to match prevailing market conditions and blend or prioritise ore to produce a valuable boric acid co- product, whose market is uncorrelated with the Project’s primary lithium product. No other lithium project offers this level of flexibility and economic advantage. In periods of low cycle lithium pricing, like today, we plan to prioritize the high-boron ore production to optimize the relative proportion of total revenue derived from boric acid.”

By prioritising High-Boron (Hi-B) ore in the first 25 years of production, the Project is poised to produce an average of ~19,200 tonnes per annum (tpa) of LCE, and 116,400 tpa of boric acid (see Table 1).

The updated Ore Reserve estimate, 95-year mine plan for stage one operations, and Project economics reaffirms Rhyolite Ridge as a highly attractive global Project to produce lithium carbonate, lithium hydroxide and boric acid. The updated findings position Ioneer, on an LCE basis, in the lowest cost quartile for lithium production globally with an estimated all-in sustaining cash cost to produce battery grade lithium hydroxide of US$5,745 and a cash cost of C1 $3,858 per tonne net of expected boric acid revenue in the first 25 years.

The Project has a stable overall operating cost structure to produce lithium carbonate and battery grade lithium hydroxide due to the scale and reliability of its boric acid credit. Boron remains one of the most stable natural resource commodities over many decades.

Ioneer has refined Project plans over the past four years and updates now include an Association for the Advancement of Cost Engineering (AACE) Class 2 capital cost estimate (-10%, +15%) with approximately 70% of the Project’s engineering complete. As a result of this and other engineering work including RAM analysis and detailed engineering design, Ioneer has adopted a more conservative approach to plant availability, equipment downtime and maintenance strategies. While this approach reduces bottom line economics, the Company believes it is appropriate for a Project of this type and scale.

The Company now estimates total capital expenditure to complete the Project will be US$1,667.9 million, including a 10% contingency.

Click here for the full ASX Release

This post appeared first on investingnews.com

Previous Post

Blue Lagoon’s Dome Mountain Joins BC’s Select List of Permitted Projects

Next Post

Lithium Universe LtdSpodumene Offtake Update

Next Post
Lithium Universe LtdSpodumene Offtake Update

Lithium Universe LtdSpodumene Offtake Update

  • Trending
  • Comments
  • Latest
Bitcoin Slips to $83.6K Amid Nvidia’s $5.5B Charge

Bitcoin Slips to $83.6K Amid Nvidia’s $5.5B Charge

October 7, 2025
Uranium Price Update: Q3 2025 in Review

Uranium Price Update: Q3 2025 in Review

October 16, 2025
Top 10 Potash Countries by Production (Updated 2024)

Top 10 Potash Countries by Production (Updated 2024)

August 21, 2024
Top 10 Phosphate Countries by Production (Updated 2024)

Top 10 Phosphate Countries by Production (Updated 2024)

August 1, 2024
Crypto Market Update: JPMorgan Deploys Dollar Deposit Token, Visa Launches Stablecoin Pilot

Crypto Market Update: JPMorgan Deploys Dollar Deposit Token, Visa Launches Stablecoin Pilot

0
New Hampshire Gov. Sununu signs $15.2B ‘miracle’ budget into law

New Hampshire Gov. Sununu signs $15.2B ‘miracle’ budget into law

0

Pennsylvania House clears tax credits for new teachers, nurses, police officers

0
Evers signs bipartisan sales tax bill aimed at sparing Milwaukee from bankruptcy

Evers signs bipartisan sales tax bill aimed at sparing Milwaukee from bankruptcy

0
Crypto Market Update: JPMorgan Deploys Dollar Deposit Token, Visa Launches Stablecoin Pilot

Crypto Market Update: JPMorgan Deploys Dollar Deposit Token, Visa Launches Stablecoin Pilot

November 15, 2025
Crypto Market Update: Bitcoin ETFs Face US$870 Million in Outflows, Price Hits Six Month Low

Crypto Market Update: Bitcoin ETFs Face US$870 Million in Outflows, Price Hits Six Month Low

November 15, 2025
Hemp THC Recriminalization: A Blow to a Blooming Industry

Hemp THC Recriminalization: A Blow to a Blooming Industry

November 15, 2025
Tech Weekly: Stock Valuation Fears Persist as US Government Reopens

Tech Weekly: Stock Valuation Fears Persist as US Government Reopens

November 15, 2025
Enter Your Information Below To Receive Trading Ideas and Latest News

Error: Contact form not found.

Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

Recent News

Crypto Market Update: JPMorgan Deploys Dollar Deposit Token, Visa Launches Stablecoin Pilot

Crypto Market Update: JPMorgan Deploys Dollar Deposit Token, Visa Launches Stablecoin Pilot

November 15, 2025
Crypto Market Update: Bitcoin ETFs Face US$870 Million in Outflows, Price Hits Six Month Low

Crypto Market Update: Bitcoin ETFs Face US$870 Million in Outflows, Price Hits Six Month Low

November 15, 2025
Hemp THC Recriminalization: A Blow to a Blooming Industry

Hemp THC Recriminalization: A Blow to a Blooming Industry

November 15, 2025
Tech Weekly: Stock Valuation Fears Persist as US Government Reopens

Tech Weekly: Stock Valuation Fears Persist as US Government Reopens

November 15, 2025
  • About us
  • Contacts
  • Privacy Policy
  • Terms & Conditions
  • About us
  • Contacts
  • Privacy Policy
  • Terms & Conditions

Copyright © 2025 revenueagenda.com | All Rights Reserved

No Result
View All Result
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy

Copyright © 2025 revenueagenda.com | All Rights Reserved