Revenue Agenda
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
No Result
View All Result
Revenue Agenda
No Result
View All Result
Home Investing

Preliminary data of Butembo Copper prospect, with near surface high-grade copper oxidized ore with grades of up to 18%

admin by admin
October 1, 2025
in Investing
0
Preliminary data of Butembo Copper prospect, with near surface high-grade copper oxidized ore with grades of up to 18%
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

African Discovery Group (OTC:AFDG) (“AFDG” or the “Company”) has entered into a term sheet to acquire the Butembo Copper exploration license in the Democratic Republic of Congo (DRC) by acquiring 100% of the shares of SOCIETE GRABIN MINING SAS (the “Transaction”). The Butembo Copper project is a greenfield exploration project located in the North Kivu province of the Democratic Republic of Congo. 40km south of the provincial capital of Beni. The project is located 33km west of the Ugandan border with verified road and rail access to the port of Mombasa.

The area is generally underexplored relative to the well-known copper belts of the Katanga copper belt to the south – however the Mesoproterozoic Kibalian greenstone belt is known for its tungsten-tin-gold occurrences, and it hosts the well-known Kilembe Mine nearby which has produced substantial quantities of both copper and cobalt

According to Rio Tinto, African deposits make up eight out of the 10 highest grade deposits discovered since 1990. The recent discovery of the Butembo copper deposit has underscored the need for further exploration work in areas peripheral to the Katanga Copper Belt.It is important to note that the artisanal pits initially targeted and extracted alluvial gold in the surficial gravels that overly the schists hosting the copper mineralization.The implication is that Butembo is prospective for both gold and copper.

The Butembo discovery is a near surface high-grade copper oxidized ore with measured grades of up to 18% with depth and lateral extension potential of over 5km along strike. The project is located at the base of the Ruwenzori mountains and borders Virunga National Park. There is extensive artisanal activity for both copper and gold and by extension a thriving small scale minerals industry exists in Butembo going back years. Regolith clay samples to the north have tested positively for copper – this is interpreted as a positive indicator of a northern extension to Butembo.

The artisanal and first phase exploration pits around the flood plain of the Talehya River, which runs through the concession, have been tested over an initial 500m of strike length – and the results have been positive with one of these analyses reporting the 18% Cu mentioned above as well as 16.3% in another exploration pit.

The deposit is in the vicinity of the historic Kilembe copper mine (4 million tons) across the border in Uganda whose sulphide mineralization occurs within biotite schists thought to have formed by hydrothermal fluids during early tectonic cycles that were trapped in structurally favorable impermeable locations. This offers a unique insight into the potential geological controls of the Butembo deposit. Mineralization is structurally controlled, occurring along northeast-trending shear zones and folds that facilitated hydrothermal fluid flow. The primary ore minerals include chalcopyrite, pyrite, and linnaeite, forming massive sulfide lenses and disseminated zones.

The Butembo deposit holds a strategically advantageous location, benefiting from proximity to regional infrastructure, which includes electrical power being available within reach of the project boundary. The site is located close to the Ugandan border, offering access to the East African transport corridor. This includes road and rail connections through Uganda to the port of Mombasa, Kenya—providing a viable export route for future development.

The combination of surface high-grade mineralization, artisanal activity, infrastructure access, and strategic location positions the Butembo Copper Project as a high-potential target for early-stage exploration and resource delineation.

Source

This post appeared first on investingnews.com

Previous Post

Silver47 Completes Successful Red Mountain Drill Program and Intersects Massive Sulfides in Multiple Holes

Next Post

Quimbaya Identifies Mineralized High-Sulfidation Porphyry System at Surface at Tahami

Next Post
Quimbaya Identifies Mineralized High-Sulfidation Porphyry System at Surface at Tahami

Quimbaya Identifies Mineralized High-Sulfidation Porphyry System at Surface at Tahami

  • Trending
  • Comments
  • Latest
Top 10 Potash Countries by Production (Updated 2024)

Top 10 Potash Countries by Production (Updated 2024)

August 21, 2024
Top 10 Phosphate Countries by Production (Updated 2024)

Top 10 Phosphate Countries by Production (Updated 2024)

August 1, 2024
Top 10 Uranium-producing Countries (Updated 2024)

Top 10 Uranium-producing Countries (Updated 2024)

November 6, 2024
7 Biggest Lithium-mining Companies in 2024

7 Biggest Lithium-mining Companies in 2024

September 18, 2024
COB: Repayment of Promissory Note

COB: Repayment of Promissory Note

0
New Hampshire Gov. Sununu signs $15.2B ‘miracle’ budget into law

New Hampshire Gov. Sununu signs $15.2B ‘miracle’ budget into law

0

Pennsylvania House clears tax credits for new teachers, nurses, police officers

0
Evers signs bipartisan sales tax bill aimed at sparing Milwaukee from bankruptcy

Evers signs bipartisan sales tax bill aimed at sparing Milwaukee from bankruptcy

0
COB: Repayment of Promissory Note

COB: Repayment of Promissory Note

October 2, 2025
Lo Herma Resource Drilling Timing Confirmed

Lo Herma Resource Drilling Timing Confirmed

October 2, 2025
Tariff Talks: Swiss Propose Investment in US Gold Refining

Tariff Talks: Swiss Propose Investment in US Gold Refining

October 2, 2025
Walker Lane Resources

Walker Lane Resources

October 2, 2025
Enter Your Information Below To Receive Trading Ideas and Latest News

Error: Contact form not found.

Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

Recent News

COB: Repayment of Promissory Note

COB: Repayment of Promissory Note

October 2, 2025
Lo Herma Resource Drilling Timing Confirmed

Lo Herma Resource Drilling Timing Confirmed

October 2, 2025
Tariff Talks: Swiss Propose Investment in US Gold Refining

Tariff Talks: Swiss Propose Investment in US Gold Refining

October 2, 2025
Walker Lane Resources

Walker Lane Resources

October 2, 2025
  • About us
  • Privacy Policy
  • Terms & Conditions
  • About us
  • Privacy Policy
  • Terms & Conditions

Copyright © 2025 revenueagenda.com | All Rights Reserved

No Result
View All Result
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy

Copyright © 2025 revenueagenda.com | All Rights Reserved