Revenue Agenda
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
No Result
View All Result
Revenue Agenda
No Result
View All Result
Home Investing

Teck Greenlights Highland Valley Expansion After Beating Q2 Profit Estimates

admin by admin
July 26, 2025
in Investing
0
Teck Greenlights Highland Valley Expansion After Beating Q2 Profit Estimates
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

Teck Resources (TSX:TECK.A,TSX:TECK.B,NYSE:TECK) has secured board approval for a multi-billion-dollar life extension of its Highland Valley copper mine in British Columbia, setting the stage for a two-decade boost in copper output.

The Vancouver-based miner said Thursday (July 24) that construction on the Highland Valley Copper Mine Life Extension Project (HVC MLE) will begin in August, following receipt of environmental and permitting approvals in June.

The newly sanctioned Highland Valley project is expected to extend the mine’s life from 2028 through 2046, with average annual copper production of 132,000 metric tons.

The company further confirmed that engineering progress is nearly 70 percent complete.

Over its lifespan, the project is expected to maintain approximately 1,500 direct jobs and US$500 million in annual GDP from current operations. During the construction phase alone, Teck said that it anticipates roughly 2,900 jobs and US$435 million in additional GDP.

“This extension of Canada’s largest copper mine, Highland Valley, is foundational to our strategy to double copper production,” said CEO Jonathan Price in the company’s announcement.

“The project will strengthen Canada’s critical minerals sector, generate new economic activity, and support the continuation of the jobs and community benefits that HVC generates for many more years to come,” Price added.

The announcement comes as Teck posted better-than-expected earnings for the second quarter. The company reported an adjusted profit of C$0.38 per share, beating the average analyst estimate of C$0.27.

The outperformance was largely attributed to stronger profitability from the company’s Trail operations, a major zinc and lead smelting complex also located in British Columbia.

Teck produced 109,100 metric tons of copper in the quarter ending June 30 but lowered its full-year copper production guidance to a range of 470,000 to 525,000 metric tons, down from earlier estimates.

While London Metal Exchange (LME) copper prices dipped 2 percent year-over-year to an average of US$4.32 per pound during the quarter, Teck could benefit from recent geopolitical developments that may tighten global copper supply.

US President Donald Trump’s planned 50 percent copper import tariff, set to take effect August 1, could push prices higher despite Teck’s minimal exposure to the US market, as most of the company’s copper exports go to Asia and Europe.

The company said that it expects the project’s total ore throughput to average 50 million metric tons annually, while total material moved will vary significantly depending on the phase.

Securities Disclosure: I, Giann Liguid, hold no direct investment interest in any company mentioned in this article.

This post appeared first on investingnews.com

Previous Post

Pinnacle Increases Non-Brokered Private Placement

Next Post

NextSource Materials

Next Post
NextSource Materials

NextSource Materials

  • Trending
  • Comments
  • Latest
Top 10 Potash Countries by Production (Updated 2024)

Top 10 Potash Countries by Production (Updated 2024)

August 21, 2024
Top 10 Phosphate Countries by Production (Updated 2024)

Top 10 Phosphate Countries by Production (Updated 2024)

August 1, 2024
Top 10 Uranium-producing Countries (Updated 2024)

Top 10 Uranium-producing Countries (Updated 2024)

November 6, 2024
7 Biggest Lithium-mining Companies in 2024

7 Biggest Lithium-mining Companies in 2024

September 18, 2024
Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

0
New Hampshire Gov. Sununu signs $15.2B ‘miracle’ budget into law

New Hampshire Gov. Sununu signs $15.2B ‘miracle’ budget into law

0

Pennsylvania House clears tax credits for new teachers, nurses, police officers

0
Evers signs bipartisan sales tax bill aimed at sparing Milwaukee from bankruptcy

Evers signs bipartisan sales tax bill aimed at sparing Milwaukee from bankruptcy

0
Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

September 8, 2025
Juggernaut Samples up to 256.60 g/t Or 8.25 oz/t Gold and Identifies 4 New Gold-Rich Zones that Remain Wide Open and are Drill Ready within the Highway of Gold Corridor on the Big One Property, Golden Triangle, B.C.

Juggernaut Samples up to 256.60 g/t Or 8.25 oz/t Gold and Identifies 4 New Gold-Rich Zones that Remain Wide Open and are Drill Ready within the Highway of Gold Corridor on the Big One Property, Golden Triangle, B.C.

September 8, 2025
E-Power Expands Targets on The Tetepisca Flake Graphite Property; Samples 68.7% Cg at The Priority Graphi-Centre Target Area

E-Power Expands Targets on The Tetepisca Flake Graphite Property; Samples 68.7% Cg at The Priority Graphi-Centre Target Area

September 8, 2025
Mining Stocks Hit All-Time Highs as Gold Breaks Through $3,600

Mining Stocks Hit All-Time Highs as Gold Breaks Through $3,600

September 8, 2025
Enter Your Information Below To Receive Trading Ideas and Latest News

Error: Contact form not found.

Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

Recent News

Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

Sun Summit Drills 78.0 Meters of 3.72 g/t Gold Including 19.1 Meters of 7.50 g/t Gold at the JD Project, Toodoggone District, B.C.

September 8, 2025
Juggernaut Samples up to 256.60 g/t Or 8.25 oz/t Gold and Identifies 4 New Gold-Rich Zones that Remain Wide Open and are Drill Ready within the Highway of Gold Corridor on the Big One Property, Golden Triangle, B.C.

Juggernaut Samples up to 256.60 g/t Or 8.25 oz/t Gold and Identifies 4 New Gold-Rich Zones that Remain Wide Open and are Drill Ready within the Highway of Gold Corridor on the Big One Property, Golden Triangle, B.C.

September 8, 2025
E-Power Expands Targets on The Tetepisca Flake Graphite Property; Samples 68.7% Cg at The Priority Graphi-Centre Target Area

E-Power Expands Targets on The Tetepisca Flake Graphite Property; Samples 68.7% Cg at The Priority Graphi-Centre Target Area

September 8, 2025
Mining Stocks Hit All-Time Highs as Gold Breaks Through $3,600

Mining Stocks Hit All-Time Highs as Gold Breaks Through $3,600

September 8, 2025
  • About us
  • Privacy Policy
  • Terms & Conditions
  • About us
  • Privacy Policy
  • Terms & Conditions

Copyright © 2025 revenueagenda.com | All Rights Reserved

No Result
View All Result
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy

Copyright © 2025 revenueagenda.com | All Rights Reserved